The grading plan specifies elevations and contours so that features of the built landscape can be accommodated and so that positive drainage can be achieved.
In this plan, specifics for a drain below grade, not only show its location, but also the depth at either end as well as changes to grade where the drainage pipe exits so that water is sure to go downhill.
